We’ve installed formwork

We’ve installed formwork for concreting the ceiling slab on the first basement level.

No items found.

Další aktuality

Completed the installation of a contact insulation

In recent months, we’ve completed the installation of a contact insulation system in two sections, and we’re currently installing the roof cladding in section B.

May 2025

The rough construction is complete!

March 2025

Formwork and reinforcement for 3. floor, section C

We’ve installed formwork and reinforcement for the ceiling slab of the third floor of section C.

August 2024

The ceiling slab of the basement is in place

The ceiling slab of the basement is in place, and the concrete work on the first floor of section C is also complete. Geotextile protects the structure from direct sunlight to prevent the concrete from overheating.

July 2024

We’ve laid the "white tub"

We’ve laid the reinforcement for the “white tub,” which we’ll then fill with special impermeable concrete. This solution replaces waterproofing.

April 2024

We’ve completed and secured the construction pit

We’ve completed and secured the construction pit. The foundation joint for laying the base concrete has also been prepared and stabilized.

March 2024